  • Bethesda Naval Hospital – P131 Colling Tower Replacement

    Demolition of existing cooling towers, erection and installation of the new 13,250-gpm cooling towers, installation of mechanical piping, and all other components; and start-up and commissioning assistance.

  • NIST – Cooling Tower Replacement

    Turn-key mechanical installation, including demolition of eight existing wooden cooling towers.  Green installed all of the mechanical equipment, above and below ground condenser water systems, oil lube lines, filtered control air, and the installation of four temporary cooling towers.  Additionally, Green field erected eight new cooling towers which were rated between 27,000-gpm and 42,000-gpm and extended the existing basins to support the new cooling towers and made concrete repairs to the existing basins.  All pipe installation and associated rigging work was also performed by Green.